The procurement plan for the 35kV booster station reconstruction project of Sichuan Fenghuang Hydropower Co., Ltd. power generation company Longfeng Hydropower Station has been approved. Upon the entrustment of the purchaser, it is proposed that the 35kV booster station of the Sichuan Power Company Limited power generation company Longfeng Hydropower Station be reconstructed. Competitive negotiation is used for procurement, and suppliers are welcome to participate in the competitive negotiation of the project (hereinafter referred to as “respondentâ€). The relevant issues are now described as follows:
I. Project Name: Reconstruction of the 35kV booster station of Sichuan Longfeng Hydropower Station, Sichuan Star Power Co., Ltd.
II. Project address: Longfeng Hydropower Station, Longfeng Ancient Town, Chuanshan District, Suining City
III. Construction Scale and Capacity:
(I) Status of booster station
The substation is located in Longping Village, Chuanshan District. The current booster station is:
1) Main transformer capacity: 1# main transformer 1×5MVA 38.5/10.5/3.15kV has been built, and 2# main transformer 1×4MVA 38.5/3.15kV.
2) 35kV part: Single busbar connection type, 35kV outgoing line 3 times, 35kV dragon line, 35kV dragon line, 35kV dragon antenna. The 35kV power distribution device adopts the general medium-sized layout of the outdoor soft bus.
3) 10kV part: Single busbar connection type, 10kV outgoing line 4 times, 10kV LongLao line, 10kV Long Front line, 10kV LongPass line, factory power system, and 10kV single busbar connection form. The 10kV power distribution device adopts a fixed switchgear type.
4), 3.15kV part: using a single bus sectional wiring type, 3.15kVI section access 1#, 2#, 3# generator, 3.15kVII section access 4#, 5# generator.
(B), the existence of hidden dangers and the necessity of transformation
The booster station of Longfeng Hydropower Station was built in the 1950s and is mainly responsible for the load on the south of the urban area of ​​the system. The 35kV circuit-breaker at the booster station in the early days of the establishment was a multi-oil circuit breaker. In 2011, the oil-free retrofit was replaced by an SF6 circuit breaker. The 35kV isolation barrier was a GW5-35II(W) type, and it has not been replaced since the establishment of the station. Only regular maintenance and repairs are conducted every year. Due to the long service life of this switch, there are often signs of mechanical sticking and poor contact.
To solve the above problems, the 35kV booster isolation barrier at Longfeng Hydropower Station should be replaced as soon as possible to ensure the safe operation of the system equipment.
Fourth, plan implementation time, duration: 45 days (Gregorian calendar).
V. Source of funds: self-raised funds
Sixth, the respondent qualification requirements
This procurement will use the post-qualification method. Respondents who do not meet the qualification requirements will be rejected.
(1) Enterprise qualification requirements:
1. This negotiation requires that the respondent must be an enterprise legal person or other organization legally registered in the territory of the People's Republic of China, has the qualifications for the independent conclusion of the contract, and has the ability to assume the responsibility for negotiating the project.
2. Comply with relevant laws and regulations of the country, and have a valid business license, tax registration certificate, and organization code certificate (or triple certificate), and the business scope of the business license complies with this procurement requirement.
3. The bidder must be registered in the territory of the People's Republic of China, have independent legal personality, and have the qualifications for professional contracting for power transmission and transformation projects issued by the relevant state agencies.
4. The main management and technical personnel who participate in the project management, on-site installation, commissioning and testing of the bidding project must have experience in participating in similar projects (provide supporting materials).
5. The bidder shall be able to ensure the timely provision of installation, commissioning and on-site test equipment required for this bidding project. The quantity and type of the equipment shall be able to meet the construction operation requirements of the bidding project.
6. On-site investigation: The bidder will contact the contractor on his own to see the on-site matters at his own expense. The bidders’ site survey should fully understand the site location, conditions, roads, storage space, loading and unloading restrictions and other conditions.
(II) Performance requirements: The bidder should have the installation capacity of electromechanical equipment corresponding to the bid for this standard and the performance of electrical equipment with a voltage rating of 35kV and above installed in the past 3 years.
(III) Financial and Credit Requirements:
1. The bidder should have good financial status and sufficient liquidity to meet the construction needs of the project. The response documents should be accompanied by the audited financial statements for the past three years.
2. In the course of domestic procurement activities, contract performance, on-site service and construction, they have not been criticized publicly.
(D) Safety and Quality Requirements:
1. Have an effective safety production license.
2. During the execution of the contract in the past three years, the project progress was not seriously affected by the respondent's problem, and no personal death or quality accident occurred.
(5) Qualification requirements for project managers and technicians:
1. The project manager shall have qualification certificates for registered building engineers of the second-level and higher-level mechanical and electrical specialties, and technical personnel and construction personnel shall have qualification certificates.
2. It has the insurance and necessary qualifications stipulated by national laws and regulations and department rules.
(6) Other requirements:
Subcontracting or subcontracting is not allowed. Consortium responses are not allowed.
(7) Relevant instructions:
1. Responsive documents should be in written form, with one copy of the original, and the responsive documents must be sealed. If any of the response documents are altered, they should be signed by the authorized representative and stamped with the company's official seal.
2. This quotation shall include all project costs within the procurement scope of the project and meet the technical requirements and the latest standards of the country and the industry as stipulated in this competitive negotiation document. This purchase only allows one plan quotation, and the buyer does not accept any Selective quote
3. The quote currency is RMB, which must be a tax payment quotation. This competitive negotiation will have the opportunity to quote again, and each quotation should be confirmed in writing. The bidder shall provide partial quotation and total quotation. If the quotation quotation does not match the total quotation, the quotation quotation shall prevail, unless the decimal point of the quotation quotation is obviously wrong. Projects provided free of charge by bidders should be filled in with the actual price of the project and marked as free. This item is not included in the total quotation or the total quotation;
4. Site investigation: The bidder himself and the contractor contact the site. The bidders conducted site surveys to fully understand the site location, environmental conditions, roads, spatial layout, and other conditions.
VII. Acquisition of procurement documents
Incremental linear encoders
Incremental Encoder is commonly used, and Absolute Encoder is used if there are strict requirements on position and zero position. Servo system should be analyzed in detail, depending on the application situation. Commonly used incremental encoder for speed measurement, which can be used for infinite accumulation measurement; Absolute encoder is used for position measurement, and the position is unique (single or multiple turns). Finally, it depends on the application situation and the purpose and requirements to be realized.
Incremental Linear Encoders,Linear Optical Encoder,Linear Position Encoder,Encoder Bearing Tester
Yuheng Optics Co., Ltd.(Changchun) , https://www.yhenoptics.com