UAV power engineering acceptance, in addition to high efficiency, these advantages

The acceptance of power line engineering quality, high-altitude quality control in overhead line engineering is a weak link. Due to the limited ability of the supervisors to climb, if only relying on the naked eye observation and telescope to check the installation quality of the tower body under the tower, the installation quality of the grounding line and other accessories of the wiring project, the means and effects are not good. If the professional climbs the inspection, it will not only increase the number of supervisors, but also increase the cost. More importantly, the personal safety risks in the supervision work will also increase. There are still cases where photographs cannot be taken at some angles, and it is impossible to form a report with credibility by eye observation alone. The innovation of UAV power transmission project acceptance is to improve the quality of acceptance, and to be subtle to the details of the routine inspection and acceptance, including the tower spray paint, anti-corrosion paint, and the irregular inspection. The UAV can effectively compensate for the acceptance of the short board. , to improve the quality of fixed assets of the grid to a new level.

With the superior performance and high-resolution camera of the Inspire 1 flight platform of DJI, you can capture the line installation situation at close range without dead angle, which not only improves efficiency, reduces manpower input, but also retains high-definition image data. Establish a data platform for future analysis and use, and report is more credible.

UAV power engineering acceptance

大疆"悟" Inspire 1

Deformation design, camera 360° unobstructed

Maximum horizontal flight speed: 22m/s (no wind environment in ATTI mode)

Control and image transmission distance: 5km

Can be equipped with a variety of visible and infrared cameras

Flight time: 18mins

Automatic return function


Now, let's take a real case to see the scene of the drone's acceptance of the power line inspection project.

In February 2016, Nanjing Dayi Aviation Technology Co., Ltd. provided a high-altitude overhead inspection and inspection image collection service for a line in Jiangsu Province.

UAV power engineering acceptance

Ground suspension point installation quality

UAV power engineering acceptance

Tension clamp drainage board installation quality

PV Aluminum Alloy Cable

Sowell Electric CO., LTD. , https://www.sowellsolar.com